Hi All,
The Issue i am facing is that, there is a scenario in which against a complaint booked, a breakdown order is created. This breakdown order includes a material which has a alternate unit of measure, For Example: Material xxxxxxxx, has Base Unit as "M" (Metres) and Alternate Unit "NOS" (Numbers). The conversion maintained is 100 NOS = 360 M. The material is a HALB type material.
I have configured the item category of the material in CRM in such a way that, if we release the breakdown order and save it, the system creates a reservation for this material in ECC.
Now, I select the Unit in the Breakdown Order as NOS (which is not the material's base unit). But, if i check the reservation created in ECC, the reservation created is in "M" (Metres).
If i create a separate reservation manually in ECC for this material for a certain plant, the unit it is considering for the reservation is NOS, but that's not the case when the same reservation gets created through CRM.
Please suggest me how to go ahead with this issue.
Regards,
Narain Durbha